Rawhide Creek Drainage Basin - Problem Area No. 7 Drainage Improvements
The Storm Drainage System Assessment and Capital Improvement Program prepared for the Town of Addison by Halff Associates in August 2017 identified improvements that are needed in the Rawhide Creek Drainage Basin.
This project includes the design of drainage improvements along the residential streets of Waterside Court, Waterford Drive, Les Lacs Avenue, Beau Park Lane, and Brookwood Lane. The drainage improvements will follow the trail south from Brookwood Lane and run west along the linear park connecting to the existing storm drain system at Marsh Lane.
Status Updates
September 8, 2021:
A public meeting will be held at the Addison Athletic Club on September 16, 2021, at 6:00 pm for citizen input. Links to the preliminary project exhibit files can be found below.
January 12, 2021:
City Council approved an agreement between the Town and Criado & Associates for Professional Engineering Services related to the Rawhide Creek Drainage Basin Improvements.
Criado and Associates, Inc. (Criado) was qualified through a Request for Qualifications process in 2017 to perform design, project management, and construction management-related services for the Town. Criado was selected to perform the design work for the Rawhide Creek Drainage Basin Improvements due to their experience with previous drainage projects and familiarity with the Town’s standards and specifications.
Criado will provide the following services under this agreement:
- Survey of the project area
- Geotechnical investigation
- Sub-surface utility location to determine the extent of existing utilities in the area
- Design of the storm drain improvements
- Bidding phase services
- Design support during construction such as review of shop drawings and Requests for Information
The design for this project is anticipated to take 10 months to complete. Construction is anticipated to begin in early 2022.